Concrete Mixing Station Daily Maintenance And Maintenance Work Is Introduced
  • Concrete Mixing Station Daily Maintenance And Maintenance Work Is Introduced

Concrete Mixing Station Daily Maintenance And Maintenance Work Is Introduced

     

Concrete Mixing Station Daily Maintenance And Maintenance Work Is Introduced Features and Benefits :

Henan DASION Mechanical Installation Co., Ltd is a professional manufacturer of concrete equipment, according to many years' production and sales of concrete mixing station technology and experience, summarizes some concrete mixing station maintenance and repair work daily method. The hope can give the new old customer to concrete mixing station maintenance work help. Concrete mixing station daily maintenance are:

1, and after the inspection before use

Check the electrical device is safe, reliable, and each stroke switch action is flexible and reliable.

Check air compressor captive device is normal, air pressure is stable in 0.5-0.7 Mpa between.

Check the measurement are in a free state, is happening interference phenomenon.

2 after work, and after the maintenance projects

Please except mixing console and debris in the material, stir thoroughly flush the tank bonding material; Check the mixing blades and lining board clearance.

Adjust and tighten mixing arm and tighten the connecting bolt axis; Cleaning the admixture silo precipitation.

Winter construction should put the road though water; Put all air compressor store jar of compressed air and water.

The lubrication part fill lube

Check gas source of couplet of two oil mist patella if there is oil and atomization normal, pneumatic system is leak phenomenon.

Check electrical electrical components within the system does have the damage phenomenon; If has the damage repair or replacement.

Check the wire rope wear, and in its surface daub (butter) apply grease.

After downtime disconnect the power supply and total power microcomputer.

3, regular maintenance and repair project

Check the blade, lining board wear, and take into consideration the replacement.

On the transmission gear for inspection, and appropriate daub grease.

Perfect operation management systems and improve the operation records and exchange class record.

4, safety precautions

Hopper after it is strictly prohibited to anyone in ascension, a stay below: it is strictly prohibited to overload running and bring load startup.

Mixing equipment, concrete unloading zone stand is strictly prohibited.

Mixing equipment maintenance, must will total power off and put up signs.

It is strictly prohibited to the operator handles and button at will.

Please leave a message, our saler will contact you as soon as possible!

  • *Name:
  • *E-mail:
  • Tel:
  • Company:
  • *Country:
  • *Inquiry:
Customer Reviews :
Frequently Questions :

Hot Products

  • Concrete Mixing Drum Concrete Mixing Drum

    1. Concrete mixing tank with Superior performance2. High quality of hydraulic system3. The design of low angle of inclination4. Simple operation and useful application5. Multi types of Chassis Matched

  • Concrete Mixer Truck Concrete Mixer Truck

    1. adopts European modern style2. featuring attractive appearance3. rational structure and stable performance4. different steel materials for different parts of tank body5. Multi types of Chassis Matc......

  • Self-loading Concrete Mixing Station Self-loading Concrete Mixing Station

    1.Equipment Type: Self-loading concrete mixing station2. Model: DS3.53. Productivity: 14m3/hr4. Weight: 7500KG5. Dimension LxWxH: 7.1x2.44x3.3m

Contact Us

Tel: +86-371-86108011
        +86-371-86108022
Fax1: +86-371-86108033
Fax2: +86-371-87575501#812
Mobile: +86-15093371337
Email:sales2@cndasion.com
Address: Dongfeng road, Jinshui zone, Zhengzhou, Henan, China.