Avoid Burning Block Making Machine Debugging

2012-11-28 09:29:24

Avoid burning Block Making Machine finish installing must to Machine debugging:
1, adjust feeding mechanism scraper and cylinder bottom clearance, shall not be more than 2 ㎜.
2, adjust feeding mechanism blanking drum bottom and the clearance between the market should be no more than 0.5 ㎜.
3, adjust feeding mechanism upper cylinder of the adjusting ring and feed between disk gap has 0.5 ㎜ - 1.
4, adjust track height, make eject air brick, die should be higher than disk 1 ㎜ (permission to use thin sheet in orbit and support surface adjust).
5, adjust the pressing Block Making Machine structure of eccentric shaft, so that it can extrude requirements of the brick.
6, adjust the back wheel mechanism of rod, gasket and crank mechanism on the spherical eccentric shaft make its automatic card in the empty trip, the path distance in no more than 3 ㎜.
7, adjust size vertical shaft of adjusting nut, make confined template bottom plane and rotating back plane should keep parallel, and had 1-1.5 ㎜ clearance.
After the commissioning, of course, don't forget to try a machine, if the line feed production again.
Pressure Block Making Machine installation is completed, have to carry on a test, test including empty section and load test two parts.
Before the trial to machines appearance inspection, tightening has not yet fastenings, clear the back wheel on the surface, cross hole and other transmission parts of the debris, and at the same time all lubricating points to add the lubricating oil, and then artificial lift machine, will back to rotary rotary 2-3 weeks, through the check machine, to make sure there are no stuck phenomenon so far.
All inspection qualified, conducted only after empty test, operation time should be no less than 2 hours, empty test should be carefully observed bearing temperature, gear meshing, motor temperature rise and lubrication condition, pay attention to pressure Block Making Machine structure and rail top brick parts work.
Empty pass the test, then gradually increase the feed feed, load test, and check each part in load under the action of work, load test not less than four hours. 



Pre :  Block Making Machine In The Cause Of The Vibration

Next :  Block Making Machine Construction Waste Comprehensive Utilization Is An Important Tool

Hot Products

  • Concrete Mixing Drum Concrete Mixing Drum

    1. Concrete mixing tank with Superior performance2. High quality of hydraulic system3. The design of low angle of inclination4. Simple operation and useful application5. Multi types of Chassis Matched

  • Concrete Mixer Truck Concrete Mixer Truck

    1. adopts European modern style2. featuring attractive appearance3. rational structure and stable performance4. different steel materials for different parts of tank body5. Multi types of Chassis Matc......

  • Self-loading Concrete Mixing Station Self-loading Concrete Mixing Station

    1.Equipment Type: Self-loading concrete mixing station2. Model: DS3.53. Productivity: 14m3/hr4. Weight: 7500KG5. Dimension LxWxH: 7.1x2.44x3.3m

Contact Us

Tel: +86-371-86108011
        +86-371-86108022
Fax1: +86-371-86108033
Fax2: +86-371-87575501#812
Mobile: +86-15093371337
Email:sales2@cndasion.com
Address: Dongfeng road, Jinshui zone, Zhengzhou, Henan, China.