Concrete Batching Plant Construction Installation Steps In Order

2012-07-13 11:47:26

Concrete batching plant set of equipment installation and construction of the steps in order is to ensure the safety of the installation and installation of the rationality, the following is installation in order of the specific steps, the hope can help you!
(1) for the installation of the finished product belt conveyor
Will the end materials belt conveyor is bent on from where, after the framework will be in, based on the before and after connect the framework, and then, before and after a leg and conveyor connected and slant supports and the frame of lug connected and then will lift the front belt conveyor, connect a leg before and after and inclined support and will last a leg before and after the anchor bolts.
(2) mixing console and powder batching system installation
Lift the host frame, on the basis of the anchor bolts.
(3) of the station of the finished product store hopper installation
Will lift the finished product store hopper, will set up a leg, will go Taiwan, ladder and finished product materials store hopper connected.
(4) concrete ingredients machine installation
Lift the concrete ingredients machine on their basis, will put board connected and the two sides are heightening board with plug-in boards connect up, then the aggregate conveyor unfolds, the will, before and after frame connected and make electric roller at the blender hood hole center, finally will anchor bolts.
(5) the mixing material storage equipment installation of cement storehouse
Will cement warehouse in the ground one by one to assembly components, lift the cement warehouse, and will next warehouse body stents less side lateral braces toward the powder batching system, fixed the fluctuation warehouse body, finally fixed the anchor bolts.
(6) screw conveyor installations
Lift the screw conveyor, will screw conveyor ball joints and cement warehouse the material mouth connected and use of material mouth are powder hopper feeding mouth, use wire rope will conveyor and cement warehouse lug connected and finally will anchor bolt fixed.
(7) lift pump in the correct position, connect the output water pipes.
(8) will air compressor in the hopper finished product side and used tracheal will air compressor export and import gas control box connected and will air control box to cement the export storehouse of arch connect the trachea.



Pre :  2012 Concrete Mixing Industry Opportunities And Challenges

Next :  Concrete Batching Plant Notes To The Normal Operation

Hot Products

  • Concrete Mixing Drum Concrete Mixing Drum

    1. Concrete mixing tank with Superior performance2. High quality of hydraulic system3. The design of low angle of inclination4. Simple operation and useful application5. Multi types of Chassis Matched

  • Concrete Mixer Truck Concrete Mixer Truck

    1. adopts European modern style2. featuring attractive appearance3. rational structure and stable performance4. different steel materials for different parts of tank body5. Multi types of Chassis Matc......

  • Self-loading Concrete Mixing Station Self-loading Concrete Mixing Station

    1.Equipment Type: Self-loading concrete mixing station2. Model: DS3.53. Productivity: 14m3/hr4. Weight: 7500KG5. Dimension LxWxH: 7.1x2.44x3.3m

Contact Us

Tel: +86-371-86108011
        +86-371-86108022
Fax1: +86-371-86108033
Fax2: +86-371-87575501#812
Mobile: +86-15093371337
Email:sales2@cndasion.com
Address: Dongfeng road, Jinshui zone, Zhengzhou, Henan, China.